PROJECT NAME ARRA
FUNDS
TOTAL PROJECT COST DESCRIPTION PURPOSE RATIONAL
Pavement Preservation Package Pima County $7,469,000 $7,469,000 Maintenance & Rehabilitation of existing urban and rural arterial and collector streets that have experienced varied degrees of deterioration.  Selected roadways are structurally sound, but do require varying degrees of pavement preservation treatment to mitigate further degradation. 

Surface rehabilitation will extend roadway life and provide improved riding and driving conditions.
Surface rehabilitation on the selected roadways can be done quickly.  (Also, the nature of the preservation work presents minimum environmental impacts.) 

This meets with the intent of the ARRA to spend the provided stimulus funds in an expeditious manner.
Pavement Preservation Package Tohono O'odham Nation 

This project is being designed and built for the Tohono O'odham Nation/San Xavier District by Pima County DOT at their request.
$2,500,000 $2,500,000 Maintenance & Rehabilitation of existing urban and rural arterial and collector streets that have experienced varied degrees of deterioration.  Selected roadways are structurally sound, but do require varying degrees of pavement preservation treatment to mitigate further degradation. 

Surface rehabilitation will extend roadway life and provide improved riding and driving conditions.
Surface rehabilitation on the selected roadways can be done quickly.  (Also, the nature of the preservation work presents minimum environmental impacts.) 

This meets with the intent of the ARRA to spend the provided stimulus funds in an expeditious manner.
Sabino Canyon Rd.
Bridge - Deck Rehabilitation
$600,000 $1,690,000 Bridge deck repairs on the Sabino Canyon Road Bridge over Tanque Verde Creek (approximately 1500 ft. south of Cloud Rd).     Project will rehabilitate the existing bridge deck that has experienced structural deterioration.

If not done, bridge load restrictions will be put in place thereby significantly impacting local traffic including a major bus route.
This rehabilitation project can be designed and built quickly meeting all the ARRA spending requirements.
Hohokam Middle School Bicycle & Pedestrian Project $575,000 $765,000 This project will construct approximately one mile of new paved shoulders on Tetakusim Road from Camino de Oeste to Sorrel Lane, a new eight-foot wide shared use path, new concrete headers, ADA-accessible sidewalk ramps, signing and pavement marking. 

Project design is 100% complete and approval to advertise is pending.  
Project eliminates unpaved/gravel walking surfaces (which often times act as a barriers, and/or obstructions) for students, residents and pedestrians. 

Also, pedestrians, bicyclists and motorists will no longer have to share the same space, resulting in increased risk to all parties.
This existing Transportation Enhancement project has completed the federal design process and is moving forward into the procurement phase for bidding. 

Spending of ARRA funds will be completed per program requirements.
  $11,144,000 = TOTAL ARRA    

Relevant links:

Approved Recovery Act Funded Projects in Arizona

Pima Association of Governments Recovery Act Information

USDOT Certification Information


 


 


Site last updated September, 2008

webmaster:
For comments pertaining to web site only.

Privacy Statement / Disclaimer

pima county seal links back to pima.gov